Related Post

Case Studies
Proyecto Iberostar Joia Aruba by GGH
Xisco Calatayud September 9, 2025
88

Iberostar Joia Aruba Project: scope x y z, context, and objectives

The Iberostar Joia Aruba project was a turning point for GGH. It was our first full-scope FF&E assignment for guest rooms, managing the entire process from value engineering to final on-site installation, while meeting all deadlines. Our goal was clear: to enhance the guest experience at Eagle Beach with sustainable, durable, and cost-effective contract-grade furniture. To achieve this, we applied an end-to-end approach combining modular design, certified materials, and carefully planned logistics.

Casos
Proyecto Iberostar Joia Aruba by GGH
Xisco Calatayud September 9, 2025
88

Proyecto Iberostar Joia Aruba: alcance, contexto y objetivos

El proyecto Iberostar Joia Aruba marcó un antes y un después para GGH. Fue nuestro primer encargo integral de FF&E para habitaciones, gestionando todo el proceso: desde la ingeniería de valor hasta la instalación final en destino, cumpliendo con los plazos establecidos. El objetivo era claro: elevar la experiencia del huésped en Eagle Beach con un mobiliario contract-grade sostenible, duradero y rentable. Para lograrlo, aplicamos un enfoque integral que combinó diseño modular, materiales certificados y una logística cuidadosamente planificada.

Insights
Green Global Hospitalirty Branding
Irene Rigo September 9, 2025
171

Green Global Hospitality Brand: from commitment to evidence

Building a Green Global Hospitality Brand is more than color and claims. At GGH I treat sustainability as an operating system that guests can feel, owners can measure, and assets can withstand. I anchor the brand in three connected levers: contract-grade design and fabrication, a governed supply chain with OS&E, and impact measurement. I specify certified materials (FSC, GREENGUARD), engineer to EN581 and ANSI/BIFMA, and attach quality control to every lot from factory to installation.